How long will I need a Travel Plan Coordinator for?

9 hours ago
3 min read

It's a question developers often ask: how long will we actually need a Travel Plan Coordinator (TPC) for and what will the role entail?


The answer depends on the requirements of the local authority, the development itself and, importantly, the planning obligations attached to it.


However, one thing is clear: a Travel Plan is a long-term commitment, not simply a document to tick off a planning condition.


What do local authorities expect?


Travel Plan monitoring requirements vary across the country and guidance is updated from time to time*. Looking at guidance from five different local authorities available at the time of writing, we've put together the table below to give a useful indication of what developers might be expected to provide.

Local Authority

Expected Duration

Monitoring Requirements

Suffolk

(published 2025)

At least 5 years after baseline monitoring, or until 1 year after final occupation, whichever is later.

Annual surveys, traffic counts and multimodal observations.

Essex

(published 2025)

Minimum of 5 years, or as long as the development takes to build (all phases), plus 1 year post final occupation.

Annual traffic counts and multimodal observations, with surveys in years 1-5.

Cambridgeshire

(published 2024)

No standard TPC appointment duration specified, assessed on a site-by-site basis.

No fixed monitoring frequency or duration, assessed on a site-by-site basis.

Norfolk

(published 2023)

Travel Plan implementation continues while any part of the development remains occupied, subject to approved modifications.

Annual surveys and traffic counts, with more detailed multimodal observations in years 1, 3, 5, 7 and so on.

Oxfordshire

(published 2021)

At least 5 years after full occupation.

Baseline monitoring survey, followed by surveys in years 1, 3 and 5.

These are just a few examples rather than universal requirements, to indicate how local authorities differ in their approach. The relevant planning condition(s), Section 106 Agreement and approved Framework Travel Plan or Transport Statement/Assessment will determine what applies to a specific development, where applicable.


How often is a TPC on-site?


Travel Plan Coordinator conducting a site audit

Although some activities benefit from face-to-face engagement, such as interviews and events, and site audits require an on-site presence, much of the ongoing Travel Plan Coordination can be managed remotely.


Typical TPC responsibilities may include but is not limited to:

  • Coordinating travel surveys and organising on-site data collection.

  • Delivering the variety of Travel Plan measures.

  • Monitoring progress towards Travel Plan targets.

  • Preparing and submitting Travel Plan reports.

  • Keeping people informed through newsletters and other marketing resources.

  • Liaising with local authorities and transport providers.

  • Reviewing and updating Travel Plan measures as the development evolves.


Some authorities also specify additional engagement activities and require additional measures if the agreed targets are not achieved by a certain point. For example, Suffolk expects an annual community sustainable travel event, alongside spring and autumn newsletters, to be included in the standard measures. If the Travel Plan target is not achieve by the end of the agreed period, the monitoring period may be extended.


The frequency of TPC site visits will depend on each development's requirements, rather than there being a universal expectation for regular attendance.


Does the TPC's involvement end when the development is fully occupied?


Not necessarily. Full occupation is an important milestone, but it doesn't automatically mean that the Travel Plan has achieved its objectives.


The post-occupation period is often when monitoring becomes particularly valuable. It allows developers and local authorities to understand how people are travelling, whether the Travel Plan targets are being achieved and whether additional measures may be necessary.


Planning ahead makes all the difference


Understanding the likely duration of a TPC appointment from the outset helps developers budget appropriately and avoid unexpected costs further down the line.


Importantly, appointing a TPC doesn't mean paying for someone to be permanently based on site. It means having an experienced professional responsible for delivering the agreed Travel Plan measures, monitoring progress and keeping the Travel Plan working throughout its required lifetime, which could be many years, depending on the size of a site and time it takes to occupy. Therefore, it's essential to have a strong working relationship with a TPC you can trust.


At CROSMO, we provide flexible Travel Plan services, tailored to the needs of individual developments. Whether you need support with a Travel Plan for condition discharge, requiring a Travel Information Pack, or looking for longer-term TPC appointment, we're here to help.


When you're ready to start planning ahead, get in touch: enquiries@crosmo.co.uk


*Please note: The local authority examples above are based on published guidance at the time of writing and illustrative planning obligations. Requirements can vary between developments and should always be checked against the relevant planning conditions and Section 106 Agreement where applicable.

 
 